Response to DOE’s Bulk-Power System Security RFI

Submitted October 9, 2026
To: U.S. Department of Energy, Office of Cybersecurity, Energy Security, and Emergency Response

Overview

RheMatrix Institute submitted a research-based response to the U.S. Department of Energy’s request for information on securing the U.S. bulk-power system. Drawing on public U.S. transaction, operator, technical, regulatory, trade, and procurement records, along with selected Korean corporate filings, the response examines how ownership, service responsibilities, technical access, and equipment replacement readiness do not always change together. It also considers what existing records can verify and when earlier reviews may need to be revisited.

The submission proposes starting with available records and seeking targeted verification when unresolved facts could materially affect legal, technical, operational, or mitigation decisions. Where additional information would not change the decision, further requests may be unnecessary.

Submission Details

AgencyU.S. Department of Energy
OfficeOffice of Cybersecurity, Energy Security, and Emergency Response (CESER)
Submission TypeResponse to Request for Information (RFI)
SubmittedOctober 9, 2026
DocketDOE-HQ-2026-1123
Comment IDDOE-HQ-2026-1123-0120
Research AreaEconomic Security & Strategic Capital
TopicEnergy Security

Selected Evidence and Issues

Ownership and service transitions. Rhode Island Energy changed ownership in 2022 while important transition services continued into 2024. The reviewed records document different dates for ownership and service transitions but do not verify the disposition of specific technical access rights.

Technical access and verification. A McIntosh power-plant case study documents an installed engineering workstation with logic-programming capability without establishing particular access privileges. Separately, a 2012 FERC audit of PJM found that completion messages and reconciliation reports did not provide sufficient permission-level evidence to verify requested employee-access changes.

Equipment replacement readiness. Public manufacturing, trade, and procurement records help distinguish production capability from project-ready supply. The response treats manufacturing capability, purchaser qualification, testing, installation, acceptance, and operating readiness as distinct forms of evidence where relevant.

Main Response and References

Read the submitted response, explanatory notes, and public source references (47 pages):

Official Record

The submission and its available attachments can also be accessed through the DOE public docket on Regulations.gov: